As part of the Milhaud wharf overhaul project, the EIFFAGE/ETPO/NEGRI/INGEROP consortium was appointed by the Ministry of the Armed Forces to carry out the overhaul of the Milhaud 1 wharf at the Toulon Naval Base in Design Realization. The project consists of the deconstruction of the existing wharf and its reconstruction to reach a length of 450m.

Production Standard: EN 10219
Steel Grade: S355JR
Lining: BARE
Coating: 450mic. Interzone954 ACQPA Im2
Diameters: 1016-914-508 mm
Wall Thicknesses: 13-16-18-20 mm
Length: 13,00 – 48,50 mm
Quantity: 10.729,50 meters, 3900 tons