Lifting holes by drilling, pad eyes, shear Ring applications, splicing at the mill and the port to achieve full lengths. Automatic UT and RT on joint welds, loading onto vessel by tandem use of vessel cranes.
Project scope is to extend the existing BC Works Terminal A in exchange for their Terminal B, which handles exports of finished products for Rio Tinto’s ongoing operations.