Scope of the project was to replace part of a major 70-year-old water supply pipeline in northwest England.
HALLBANK ENGLAND
HALLBANK ENGLAND
Info
Production Standard EN 10224 Steel Grade S275JR Lining 500 micron Eurokote Thixo Epoxy Coating 3LPE as per DIN30670 N-n (Blue) Diameters 1626 mm OD Wall Thicknesses 12,5 mm Quantity 10.000 m - 5200 Mtons Length 14
FT PIPELINE SYSTEMS
Water Pipelines