TOULON PROJECT FRANCE

As part of the Milhaud wharf overhaul project, the EIFFAGE/ETPO/NEGRI/INGEROP consortium was appointed by the Ministry of the Armed Forces to carry out the overhaul of the Milhaud 1 wharf at the Toulon Naval Base in Design Realization. The project consists of the deconstruction of the existing wharf and its reconstruction to reach a length of 450m. 

  • Production Standard: EN 10219
  • Steel Grade: S355JR
  • Lining: BARE 
  • Coating: 450mic. Interzone954 ACQPA Im2
  • Diameters: 1016-914-508 mm 
  • Wall Thicknesses: 13-16-18-20 mm
  • Length:  13,00 – 48,50 mm
  • Quantity: 10.729,50 meters, 3900 tons